Post by pharmadave on Jul 27, 2017 12:44:04 GMT 11
|
|
|
Post by pharmadave on Jul 27, 2017 13:06:02 GMT 11
|
|
|
Post by Phoebe on Jul 27, 2017 16:52:03 GMT 11
Someone actually announced this some time ago. Today it is official. Wonder how long before it is a reality
|
|
|
Post by stewartm on Jul 29, 2017 4:54:07 GMT 11
Yes I did phoebe, been in discussions for a while, the minister did say it would happen. I know the tender was out many months back, as tritium I understand was tendering for it. Given there is a state election in the next few months, this may give them some green vote. I have to say that Steven Miles has been visibly committed to it for a long time. It will happen as the energy companies have already been advised to provide substantial power to rest stops on the Bruce highway. The completion date from memor was march 2018. Well done I say.
tried to upload the map, but says forum exceeded attachment limit ??
|
|
|
Post by stewartm on Aug 13, 2017 6:09:15 GMT 11
Map from Queensland government
|
|
|
Post by stewartm on Oct 28, 2017 12:20:57 GMT 11
First couple are in, Cairns and Rockhampton. Not sure if the contract has changed but the Rocky one isn't a Veefil. Not sure why the change has happened. They are supposed to roll out all within 6 months, holding breath...
|
|
|
Post by empowerrepower on Oct 29, 2017 0:02:34 GMT 11
Hi Stewart, do you have any info on where the Bris charger will be?
|
|
|
Post by stewartm on Oct 29, 2017 13:32:13 GMT 11
No I don't sorry, will try a phone call to the department tomorrow. Mark Bailey has been pretty forthcoming on info. Although I see we have an election in a month now..
|
|
|
Post by lesmando24 on Oct 29, 2017 15:29:47 GMT 11
|
|
|
Post by empowerrepower on Oct 29, 2017 20:25:56 GMT 11
Hi Lesmando, is there any info at that site, as I couldn't see anything beyond the rather vague map?
|
|
|
Post by stewartm on Oct 30, 2017 21:28:09 GMT 11
Waiting to hear back from the ministers office. Have asked for actual locations and estimated online dates. They have said that by calendar year end all will be operational.
|
|
|
Post by stewartm on Nov 8, 2017 11:32:35 GMT 11
The tender shows 17th Dec all done and running;
EV SUPERHIGHWAY - ELECTRIC VEHICLE CHARGERS(CLOSED TENDER)
Organisation: Queensland Government Issued by: Ergon Energy Corporation Limited Tender #: 00001476 Location: Queensland : Cairns & Far North Queensland, Gladstone, Mackay Whitsunday Region, Rockhampton, South East Queensland Category: Civil Construction Services : Civil & Earth Works (General) Electrical Systems & Lighting & Equipment & Services : Electrical Services, Electrical wire & cable & harness, Switchboards & Switchgear Signage : Signage Closing date: 30-08-2017(closed) Description: The scope of this project is all contractor performed electrical, civil and signage works required for the installation of EV Chargers for the following locations. Tully, Bowen, Mackay, Carmila, Marlborough, Miriam Vale (Northern Package) and Childers, Maryborough, Cooroy, Charlton, Springfield and Helensvale (Southern Package). The scope excludes work to be completed by the electrical utility provider.
The following general scope refers to site specific preliminary concept sketches (subject to change) attached to the appendix of the Scope of Works: * Procurement, install and energisation of a standalone 3 phase switchboard and mounting plinth.
* Install and energisation of 2 chargers (one of each per site): * 1xTritium Veefil - TRI93-50-01 “Veefil 50kW DC Fast Charger * 1xEVlink 44kW AC EV Charger
* Procurement and install of all underground conduits and consumer mains. Including the following; * 2x63mm electrical underground conduits from distribution board to charger locations via 2xP5 electrical pits (see site specific details for locations/lengths). * 1x100mm electrical underground conduit between Ergon Point of Supply and 3 phase LV switchboard (see site specific details for locations/lengths).
* Installation of concrete foundation and slab to accommodate charging units, signage and bollards. * Removal of vegetation, paving, garden beds etc. as required for adequate installation (please see site specific details for more information). * Site clean-up, rubbish disposal and re-instatement to the satisfaction of The Principal.
All site works including testing and commissioning to be completed by 17 December 2017.
Tenders are to be submitted on the basis that they are for the whole Contract or for complete packages.
Ergon Energy’s preference is to award one Contract for Packages 1 & 2 (all sites) to a single Contractor however may elect to award Package 1 and Package 2 as separate Contracts to different Contractors.
|
|
|
Post by empowerrepower on Nov 8, 2017 15:27:04 GMT 11
The date is a relief. With the election at the end of the month, and the other side promising to build a coal fired power station and ditch the 50% state renewable target, I wouldn't have confidence with the super highway being completed unless the contracts were locked in.
|
|
|
Post by stewartm on Nov 8, 2017 20:03:30 GMT 11
Was told today that the Cooroy one near the railway station is almost complete. Will try to get a photo. Really need that halfway one to Brisbane near caboolture.
|
|
|
Post by stewartm on Dec 4, 2017 15:52:57 GMT 11
|
|
|
Post by stewartm on Dec 4, 2017 15:59:01 GMT 11
|
|
|
Post by rusdy on Dec 5, 2017 12:02:03 GMT 11
I was checking the QLD quick chargers on the Plugshare map, and found by mistake New Zealand's chargers when zooming out. I'm completely devastated how far behind Australia is.
|
|
|
Post by Feng on Dec 5, 2017 13:06:43 GMT 11
Have you seen Japan's? There are so many there it's a little overwhelming.
|
|
|
Post by rusdy on Dec 5, 2017 16:36:08 GMT 11
Have you seen Japan's? There are so many there it's a little overwhelming. Yup, but left so far behind Japan doesn't make feel as devastated as NZ. Sorry NZ-ers, no offence , but it's a true compliment to yous!
|
|
|
Post by stewartm on Dec 6, 2017 10:04:24 GMT 11
|
|
|
Post by Feng on Dec 6, 2017 10:47:01 GMT 11
That's awesome, but the distances between some of the fast chargers are too far apart for us to get to without a top up in between. Anyone here planning to give it a try?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 6, 2017 10:58:57 GMT 11
That’s cos people live in apartments in japan and can’t ac slow charge at home. So they have to use the service station charge model
Also special deals from Nissan
|
|
|
Post by stewartm on Dec 6, 2017 11:43:02 GMT 11
On the overall map the longest will be 120km between DC chargers, if Nissan do my battery I will be ok
|
|
|
Post by Feng on Dec 6, 2017 12:58:01 GMT 11
Ahh I didn't think to check the complete map, I was just going off the Plugshare entries. Nice! Hope NSW gets something similar.
|
|
|
Post by stewartm on Dec 13, 2017 8:03:00 GMT 11
|
|
|
Post by empowerrepower on Dec 14, 2017 8:56:21 GMT 11
On the overall map the longest will be 120km between DC chargers, if Nissan do my battery I will be ok A bit of a pity that there is such a big gap between Cooroy on the Sunshine Coast, and the Hamilton charger in Bris. With the BMW and Uni of Qld chargers not that far away from the Hamilton charger, the coverage of the north side of Brisbane has a big gap. And Cooroy is 50 mins drive north of me, so not a fast charger I could use on my way south. Still, good to see the electric highway finally installed after a lot of talk.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Dec 14, 2017 8:59:39 GMT 11
Why is Rockhampton not Veefil ?
|
|
|
Post by stewartm on Dec 15, 2017 10:08:20 GMT 11
|
|
|
Post by stewartm on Dec 15, 2017 10:23:13 GMT 11
Rocky had bought one under Ergon Energy, so used that I understand. Quite amazing, started the year with three, now 17
|
|
|
Post by stewartm on Dec 18, 2017 9:23:21 GMT 11
|
|